A – Analysis used to identify three types of customer requirements. B – Build quality into a product to avoid errors and defects. C -This
A – Analysis used to identify three types of customer requirements. B – Build quality into a product to avoid errors and defects. C -This
SCRAMBLED WORD UNSCRAMBLED MATCHES DEFINITION 1. HOHNIS Hoshin G – Planning process to achieve key performance breakthroughs. 2. ASIWKIHA Ishikawa D – This fish-shaped diagram
Make sure a Kaizen event is the right project type for your improvement efforts. Kaizen events are best for complicated, but well defined problems, requiring many

Melissa Dejkunchorn (Day-kin-shorn) first learned Lean Six Sigma (LSS) methodologies at Proctor & Gamble and has used them effectively throughout her career to improve processes,
An Introduction to the EUQ (Employee Utilization Quotient) Assessment by Paul D. Gormas SPHR, Lean Six Sigma Master Black Belt, MBA, President, Breakthrough Performance
Lean Six Sigma projects don’t have to last a long time to yield significant results. A hospital was concerned about the amount of time it

MARCH 29, 2019 ALUMNI MEETING NOTES The discussion topic for Breakthrough Performance Group’s Alumni Luncheon in Cincinnati on March 29 was ageism. Over 25 alumni

J.B. Wilcox is a February 2018 graduate of Breakthrough Performance Group’s Black Belt class. An Aerospace Engineer, J.B. began his career in the Marine Corps

“I would recommend Breakthrough Performance Group’s Lean Six Sigma Black Belt training for anyone in any industry.” That was Jenna McHugh’s reply to the question

David Yung (pictured with Tasos Georgopoulos, Director, and Instructor at BPG, in the top two photos in the collage), is an engineer with 10 years background